Title: | Trecho intransitável na Transamazônica |
Other Titles: | Impassable section of the Transamazônica |
Authors: | OLIVEIRA, Guilherme Friedenreich Cavalcanti de LODO, Leonardo Alves da Silva FERREIRA, Marcelo de Jesus IGUAL, Pedro Henrique Cardoso SANTOS, Victor Plácido dos |
Advisor: | NEVES, Vinicius Moreira das |
Other contributor: | NEVES, Vinicius Moreira das ORTEGA, Roberto Aljona SILVA, Melise Pereira Lopes da |
type of document: | Monografia |
Keywords: | Logística;Pavimentação asfáltica;Infraestrutura;Sustentabilidade |
Issue Date: | 26-Jun-2025 |
Publisher: | 141 |
Citation: | OLIVEIRA, Guilherme Friedenreich Cavalcanti de; LODO, Leonardo Alves da Silva; FERREIRA, Marcelo de Jesus; IGUAL, Pedro Henrique Cardoso; SANTOS, Victor Plácido dos. Trecho intransitável na Transamazônica. 2025. Monografia (Curso Técnico em Logística) - Escola Técnica Estadual Prof.ª Maria Cristina Medeiros, Centro Paula Souza, Ribeirão Pires (SP), 2025. |
Abstract: | Este Trabalho de Conclusão de Curso (TCC) analisa os impa ctos logísticos, sociais e ambientais da Rodovia Transamazônica (BR -230), tendo e m foco o trecho en tre as cidades de Uruará e Placas, no sudoeste do Pará, este trecho tem aproximadamente 60 km de extensão e bastante relevante para a região, neste trecho passa produtos importan tes como agropecuários (soja, milho, gado) e madeireiros, ele também é uma via bastante utilizada para chegar ao porto de Santarém. O TCC propõe a pavimentação com paralelepípedos como alternativa ao asfalto. Utilizando estudo de caso, com análise qualitativa e coleta de dados sobre infraestrutura, cad eias produtivas e mobilidade, o estudo revela que a precariedade da rodovia, agravada no período chuvoso, compromete o transporte de bens essenciais e isola comunidades, aumenta o custos logístico, o preço do frete e automaticamente aumenta os preços gerais como mantimentos e outras mercadorias essenciais para a população local. A pavimentação com paralelepípedos é apresentada co mo solução de menor custo ao longo do te mpo, ten do maior durabilidade e menor impacto a mbiental, promovendo eficiência logística e desenvolvimento regional. Conclui -se que essa alternativa fortalece a econo mia local e a integração so cial, com recomendações para investimentos públicos.
Palavras-chave: Logística; Infraestrutura; Transamazônica; Pavimentação; Sustentabilidade. This Final Course Work (TCC) analyzes the logistical, social, and environmental impacts of the Trans-Amazonian Highway (BR-230), focusing on the section between the cities of Uruará and Placas, in southwestern Pará. This section is approximately 60 km long and highly relevant to the region. This section carries important agricultural products (soybean, corn, cattle) and timber. It is also a widely used route to reach the port of Santarém. The TCC proposes paving with cobblestones as an alternative to asphalt. Using a case study, qualitative analysis, and data collection on infrastructure, production chains, and mobility, the study reveals that the precariousness of the highway, exacerbated during the rainy season, compromises the transportation of essential goods and isolates communities. It increases logistical costs and freight costs, and automatically raises general prices for groceries and other essential goods for the local population. Cobblestone paving is presented as a lower-cost solution over time, offering greater durability and less environmental impact, promoting logistical efficiency and regional development. It is concluded that this alternative strengthens the local economy and social integration, with recommendations for public investment. Keywords: Logistics; Infrastructure; Trans-Amazonian Highway; Paving; Sustainability. |
URI: | https://ric.cps.sp.gov.br/handle/123456789/36159 |
Appears in Collections: | Trabalhos de Conclusão de Curso |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
logistica_2025_1_marcelodejesusferreira_trechoinstransitaveldatranzamazonica.pdf Restricted Access | TCC | 404.5 kB | Adobe PDF | View/Open Request a copy |
logistica_2025_1_marcelodejesusferreira_trechoinstransitaveldatranzamazonica_TA.pdf Restricted Access | Termo de Autorização | 209.62 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.