Please use this identifier to cite or link to this item:
https://ric.cps.sp.gov.br/handle/123456789/47529Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | RUGGERO, Sergio Miele | - |
| dc.contributor.author | FONSECA, Laura Franciny Carvalho da | - |
| dc.contributor.author | NUNES, Laura Maria | - |
| dc.contributor.author | NEUTO, Lucas Gabriel Lopes | - |
| dc.contributor.other | JESUS, Leandro Souza de | - |
| dc.contributor.other | SANTOS, Nilza Aparecida dos | - |
| dc.date.accessioned | 2026-08-11T17:47:53Z | - |
| dc.date.available | 2026-08-11T17:47:53Z | - |
| dc.date.issued | 2026-06-10 | - |
| dc.identifier.citation | FONSECA, Laura Franciny Carvalho da; NUNES, Laura Maria; NEUTO, Lucas Gabriel Lopes. Automação no processo de montagem de fixadores eólicos, 2026. Trabalho de Conclusão de Cursp (Curso Superior de Tecnologia em Gestão da Produção Industrial) - Faculdade de Tecnologia de Diadema "Luigi Papaiz", Diadema, 2026. | pt_BR |
| dc.identifier.uri | https://ric.cps.sp.gov.br/handle/123456789/47529 | - |
| dc.description.abstract | O projeto propõe a automatização do processo de montagem de fixadores eólicos em uma fábrica de parafusos, hoje feito manualmente. A proposta é implementar um sistema pneumático com ferramentas específicas para rosquear as peças, utilizando a infraestrutura de ar comprimido já existente na fábrica. A análise será realizada através de um estudo de caso, focando em uma etapa específica da linha de produção de uma empresa do ramo de fixadores localizada em Diadema, São Paulo. A metodologia aplicada é quantitativa, com análise de tempo de ciclo, produtividade e capacidade de produção. A pesquisa buscou avaliar os impactos da automatização na produtividade. A fundamentação teórica inclui conceitos de Lean Manufacturing, demonstrando como a aplicação de métodos enxutos pode melhorar a eficiência e o desempenho do processo industrial. | pt_BR |
| dc.description.abstract | This project proposes the automation of the assembly process for wind turbine fasteners in a screw factory, a process currently done manually. The proposal involves implementing a pneumatic system with specific tools for threading the parts, utilizing an existing compact infrastructure within the factory. An analysis will be conducted through a case study, focusing on a specific stage of the production line of a fastener company located in Diadema, São Paulo. The methodology applied is quantitative, analyzing cycle time, productivity, and production capacity. The research aimed to evaluate the impact of automation on productivity. The theoretical framework includes Lean Manufacturing concepts, demonstrating how the application of comprehensive methods can improve the efficiency and performance of the industrial process. | pt_BR |
| dc.description.sponsorship | Curso Superior de Tecnologia em Gestão da Produção Industrial | pt_BR |
| dc.language.iso | pt_BR | pt_BR |
| dc.publisher | 217 | pt_BR |
| dc.subject | Automação | pt_BR |
| dc.subject | Máquinas pneumáticas (desenvolvimento) | pt_BR |
| dc.subject | Produtividade | pt_BR |
| dc.subject.other | Produção Industrial | pt_BR |
| dc.title | Automatização no processo de montagem de fixadores eólicos | pt_BR |
| dc.type | Monografia | pt_BR |
| dcterms.type | - | pt_BR |
| Appears in Collections: | Trabalhos de Conclusão de Curso | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| AUTOMATIZAÇÃO NO PROCESSO DE MONTAGEM DE FIXADORES EÓLICOS - Laura Fonseca.pdf Restricted Access | 919.46 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.