Please use this identifier to cite or link to this item: https://ric.cps.sp.gov.br/handle/123456789/35946
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorBONETTE, Luiz Rodrigo-
dc.contributor.authorFABIANO, Gabriel Fernando-
dc.contributor.authorDIAS, Genekis Gaspar-
dc.contributor.otherBONETTE, Luiz Rodrigo-
dc.contributor.otherSANTOS, Silvânia Soares da Silva-
dc.contributor.otherLEONE, Edmar Lucas-
dc.date.accessioned2025-09-18T18:18:30Z-
dc.date.available2025-09-18T18:18:30Z-
dc.date.issued2025-06-28-
dc.identifier.citationFABIANO, Gabriel Fernando; DIAS, Genekis Gaspar. Planejamento e controle da produção: um plano de ação para o controle da síndrome de lead time em uma indústria do setor metalúrgico. Artigo Científico (Curso Superior de Tecnologia em Gestão da Produção Industrial) - Faculdade de Tecnologia de Sertãozinho "Dep. Waldyr Alceu Trigo", Sertãozinho, 2025.pt_BR
dc.identifier.urihttps://ric.cps.sp.gov.br/handle/123456789/35946-
dc.descriptionArtigo publicado no evento "XXXII Simpósio de Engenharia de Produção: Produção na Era da Customização em Massa: Tendências Tecnológicas e Operacionais"pt_BR
dc.description.abstractO Planejamento e Controle da Produção tem em sua ação o monitoramento para que as metas de produção sejam cumpridas através de ajustes pelos apontamentos do sistema produtivo de uma indústria pelo cálculo da estrutura analítica do produto. Dentre diversos apontamentos da literatura a longo prazo, foi descoberta a síndrome de lead time dentro do Planejamento e Controle da Produção (PCP). O objetivo geral desta pesquisa-ação é propor um plano de ação com base na identificação e análise da síndrome de lead time no planejamento e controle da produção em uma indústria do setor metalúrgico. O método qualitativo da pesquisa-ação tem, em forma sintética, a proposição de um plano de ação, a fim de diagnosticar e resolver, nesse caso dentro da gestão de produção, limitações em seu processo produtivo. O presente estudo atingiu seu objetivo ao identificar e analisar a síndrome de lead time no PCP de uma indústria metalúrgica, propondo um plano de ação prático e eficaz que, ao integrar ferramentas como Kanban, buffers de segurança e fluxogramas otimizados, contribui para a redução de atrasos, maior eficiência operacional e melhor integração entre os setorespt_BR
dc.description.abstractProduction Planning and Control (PPC) involves monitoring production targets to ensure they are met through adjustments to a company's production system records and calculations of the product breakdown structure. Among several long-term findings in the literature, lead-time syndrome was discovered within Production Planning and Control (PPC). The overall objective of this action research is to propose an action plan based on the identification and analysis of lead-time syndrome in production planning and control in a metalworking industry. The qualitative method of action research, in summary form, proposes an action plan to diagnose and resolve, in this case within production management, limitations in the production process. This study achieved its objective by identifying and analyzing lead-time syndrome in the PPC of a metalworking industry, proposing a practical and effective action plan that, by integrating tools such as Kanban, safety buffers, and optimized flowcharts, contributes to reducing delays, increasing operational efficiency, and improving integration between sectors.pt_BR
dc.description.sponsorshipCurso Superior de Tecnologia em Gestão da Produção Industrialpt_BR
dc.language.isopt_BRpt_BR
dc.publisher176pt_BR
dc.subjectAdministração da produçãopt_BR
dc.subjectPlanejamento da produçãopt_BR
dc.subjectControle da produçãopt_BR
dc.subjectPesquisapt_BR
dc.subject.otherProdução Industrialpt_BR
dc.titlePlanejamento e controle da produção: um plano de ação para o controle da síndrome de lead time em uma indústria do setor metalúrgicopt_BR
dc.title.alternativeProduction planning and control: an action plan for controlling lead time syndrome in a metallurgical industrypt_BR
dc.typeArtigo Científicopt_BR
dcterms.type-pt_BR
Appears in Collections:Trabalhos de Conclusão de Curso

Files in This Item:
File Description SizeFormat 
gestao_da_producao_industrial_2025_1_gabriel_fernando_fabiano_planejamento_e_controle.pdf855.04 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.