Use este identificador para citar ou linkar para este item: https://ric.cps.sp.gov.br/handle/123456789/47445
Registro completo de metadados
Campo DCValorIdioma
dc.contributor.advisorSILVA, Claudio Gonçalves da-
dc.contributor.advisorMISSORINO, João Carlos-
dc.contributor.authorCARUANO, Fabricio Ismael Aud-
dc.contributor.authorNASCIMENTO, João Paulo Prada-
dc.contributor.authorBARBOSA NETO, José Dias-
dc.contributor.authorMARTINS, Márcio Vinícius-
dc.contributor.authorROMERA FILHO, Pedro-
dc.contributor.authorSANTOS, Wesley Filipe dos-
dc.contributor.otherLUCHIARI, Claudemir-
dc.date.accessioned2026-08-10T12:05:40Z-
dc.date.available2026-08-10T12:05:40Z-
dc.date.issued2015-
dc.identifier.citationCARUANO, Fabricio Ismael Aud; NASCIMENTO, João Paulo Prada; BARBOSA NETO, José Dias; MARTINS, Márcio Vinicius; ROMERA FILHO, Pedro; SANTOS, Wesley Filipe dos. Cláusulas contratuais: as construtoras e o não cumprimento no prazo de entrega de imóveis, 2015. Trabalho de Conclusão de Curso (Curso Técnico em Transações Imobiliárias) - Etec Profa. Anna de Oliveira Ferraz, Araraquara, 2015.pt_BR
dc.identifier.urihttps://ric.cps.sp.gov.br/handle/123456789/47445-
dc.description.abstractA pesquisa retrata em um primeiro momento a incorporação imobiliária e a importância do patrimônio de afetação na visão dos adquirentes de unidades imobiliárias, verificando que este (o patrimônio de afetação) é a maior garantia do adquirente. A partir daí, faz-se um pequeno esboço sobre a natureza dos contratos, e o fundamento legal que pode servir de arrimo ao consumidor, caso a entrega do imóvel não seja entregue no prazo estipulado. Em conclusão, verificou-se que caso venha a ser modificada a cláusula penal contratual para que se aplique à construtora o mesmo dispositivo relativo à inadimplência, é possível, a partir daí, exigir-se a multa por atraso na entrega do imóvel cumulada com os lucros cessantes pela provação do seu uso ou fruição, devidamente corrigidos monetariamente. Palavras-chave: Patrimônio de afetação. Incorporação imobiliária. Contratos.pt_BR
dc.description.abstractThe research initially portrays real estate development and the importance of the segregation of assets from the perspective of property buyers, noting that this (the segregation of assets) is the buyer's greatest guarantee. From there, it gives a brief overview of the nature of contracts and the legal basis that can support the consumer if the property is not delivered within the stipulated time. In conclusion, it was noted that if the contractual penalty clause is modified so that the same rule regarding default applies to the developer, it is then possible to demand both the late delivery penalty and lost profits due to the inability to use or enjoy the property, properly adjusted for inflation. Keywords: Segregation of assets. Real estate development. Contracts.pt_BR
dc.description.sponsorshipCurso Técnico em Transações Imobiliáriaspt_BR
dc.language.isopt_BRpt_BR
dc.publisher029pt_BR
dc.subjectIncorporação imobiliáriapt_BR
dc.subjectContratospt_BR
dc.subject.otherGestão e Negóciospt_BR
dc.titleCláusulas contratuais: as construtoras e o não cumprimento no prazo de entrega de imóveis na plantapt_BR
dc.typeMonografiapt_BR
dcterms.type-pt_BR
Aparece nas coleções:Trabalhos de Conclusão de Curso

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
Cláusulas contratuais - as construtoras e o não cumprimento no prazo de entrega de imóveis na palnta.pdf
  Restricted Access
22.39 MBAdobe PDFVisualizar/Abrir    Solictar uma cópia


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.