Please use this identifier to cite or link to this item: https://ric.cps.sp.gov.br/handle/123456789/34067
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorMALUF FILHO, William Manjud-
dc.contributor.authorVERISSIMO, Carlos-
dc.contributor.authorCOSTA, João Victor-
dc.contributor.otherSANTOS, Sandro Oliveira dos-
dc.contributor.otherMOURA JUNIOR, Antônio José de-
dc.date.accessioned2025-07-18T12:30:03Z-
dc.date.available2025-07-18T12:30:03Z-
dc.date.issued2024-
dc.identifier.citationVERISSIMO, Carlos; COSTA, João Victor. Implementação de poka-yoke na montagem de motores: desenvolvimento de dispositivo para solucionar erros no acoplamento da bomba de óleo. 2024. Trabalho de Conclusão de Curso (Curso Superior de Tecnologia em Fabricação Mecânica) - Faculdade de Tecnologia de Mauá, Mauá-SP, 2024.pt_BR
dc.identifier.urihttps://ric.cps.sp.gov.br/handle/123456789/34067-
dc.descriptionTrabalho de conclusão de curso apresentado à FATEC Mauá como parte dos requisitos para obtenção do título de Tecnólogo em Fabricação Mecânica. Orientador: Prof. Dr. William Manjud Maluf Filho.pt_BR
dc.description.abstractO presente trabalho aborda a implementação de um dispositivo "Poka-Yoke" na linha de montagem de motores em uma empresa automobilística, com o objetivo de solucionar erros no acoplamento da bomba de óleo ao motor. O problema identificado ocorre quando o operador esquece de acoplar o eixo de transmissão à bomba de óleo, resultando em baixa pressão de óleo no motor durante os testes, o que pode acarretar falhas graves, como a fundição do motor. Para mitigar esse erro humano, a engenharia da empresa desenvolveu um dispositivo que verifica se o acoplamento foi realizado corretamente antes de finalizar a montagem do motor. A implementação do dispositivo mostrou-se eficaz, eliminando completamente os erros de acoplamento e garantindo a qualidade do processo de montagem. A análise do problema foi realizada com o uso da ferramenta 24 horas, baseada na metodologia dos 5 porquês, e a eficácia da solução é monitorada por meio de reuniões diárias de qualidade.pt_BR
dc.description.abstractThis study addresses the implementation of a "Poka-Yoke" device in the engine assembly line of an automotive company, aiming to resolve errors related to the coupling of the oil pump to the engine. The identified issue occurs when the operator forgets to couple the transmission shaft to the oil pump, resulting in low oil pressure during engine tests, which can lead to severe failures, such as engine seizure. To mitigate this human error, the company's engineering department developed a device that checks whether the coupling has been correctly performed before completing the engine assembly. The implementation of the device has proven effective, completely eliminating coupling errors and ensuring the quality of the assembly process. The problem analysis was conducted using the 24-hour tool, based on the 5 Whys methodology, and the effectiveness of the solution is monitored through daily quality meetings.pt_BR
dc.description.sponsorshipCurso Superior de Tecnologia em Fabricação Mecânicapt_BR
dc.language.isopt_BRpt_BR
dc.publisher113pt_BR
dc.subjectControle da qualidadept_BR
dc.subjectIndústria automobilísticapt_BR
dc.subjectGestão da qualidadept_BR
dc.subjectManufatura enxutapt_BR
dc.subject.otherControle e Processos Industriaispt_BR
dc.titleImplementação de poka-yoke na montagem de motores : desenvolvimento de dispositivo para solucionar erros no acoplamento da bomba de óleo.pt_BR
dc.title.alternativeImplementation of poka-yoke in engine assembly : development of a device to prevent errors in oil pump coupling.pt_BR
dc.typeMonografiapt_BR
dcterms.type-pt_BR
Appears in Collections:Trabalhos de Conclusão de Curso

Files in This Item:
File Description SizeFormat 
fabricacaomecanica_2024_2_carlosverissimo_implementacaodepokayokenamontagemdemotores.pdf
  Restricted Access
830.26 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.