Please use this identifier to cite or link to this item: https://ric.cps.sp.gov.br/handle/123456789/15480
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSILVA, Silvia Aparecida José e-
dc.contributor.authorSILVA, Diego Soares da-
dc.contributor.otherGARBERO, Reydner Furtado-
dc.contributor.otherCAETANO, Luiz Carlos-
dc.date.accessioned2023-12-29T12:02:33Z-
dc.date.available2023-12-29T12:02:33Z-
dc.date.issued2023-11-28-
dc.identifier.citationSILVA, Diego Soares da. Relatório técnico de projeto de melhoria na empresa Suzano Papel e Celulose S/A, 2023. Trabalho de conclusão de curso (Curso Superior de Tecnologia em Gestão Empresarial) - Faculdade de Tecnologia de Americana "Ministro Ralph Biasi", Americana, 2023.pt_BR
dc.identifier.urihttps://ric.cps.sp.gov.br/handle/123456789/15480-
dc.description.abstractO presente relatório foi elaborado com o intuito de reduzir o tempo de setup de máquina. Elaboraborado pelo curso de Gestão Empresarial, na Escola Superior de Tecnologia FATEC de Americana. Durante a experiência profissional na empresa SUZANO PAPEL E CELULOSE S/A, que dedica a sua atividade a produzir papel e celulose, foi identificada a necessidade de melhorar um dos indicadores de performance, nomeadamente os tempos médios de preparação. Foi identificado um GAP no processo operacional de setup de máquina e com isso foi elaborado um plano de ação, baseado na aplicação do sistema SMED. O objetivo é reduzir o tempo de setup de máquina, transformando setup interno em externo, a fim de evitar perdas de prazos e tempo improdutivo, o que alivia também o orçamento de custos.pt_BR
dc.description.abstractThis report was prepared with the aim of reducing machine setup time – Business Management, at the FATEC School of Technology. During professional experience at the company SUZANO PAPEL E CELULOSE S/A, which dedicates its activity to producing paper and cellulose, the need to improve one of the performance indicators (Setup) was identified, namely the average preparation times. Based on this analogy, a GAP was identified in the machine setup operational process, and an action plan was created, based on the application of the SMED system. The objective is to reduce machine setup time, transforming internal setup into external setup, in order to avoid missed deadlines and unproductive time, which also alleviates the cost budget.pt_BR
dc.description.sponsorshipCurso Superior de Tecnologia em Gestão Empresarialpt_BR
dc.language.isopt_BRpt_BR
dc.publisher004pt_BR
dc.subjectAdministração da produçãopt_BR
dc.subjectAdministração de empresaspt_BR
dc.subject.otherGestão e Negóciospt_BR
dc.titleRelatório técnico de projeto de melhoria na empresa Suzano Papel e Celulose S/Apt_BR
dc.title.alternativeTechnical report on an improvement project at the company Suzano Papel e Celulose S/Apt_BR
dc.typeRelatório Técnicopt_BR
Appears in Collections:Trabalhos de Conclusão de Curso

Files in This Item:
File Description SizeFormat 
20232S_Diego Soares da Silva_OD1800.pdf
  Restricted Access
6.62 MBAdobe PDFView/Open Request a copy
TA - Diego Soares da Silva.pdf
  Restricted Access
990.83 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.