Please use this identifier to cite or link to this item:
https://ric.cps.sp.gov.br/handle/123456789/15480
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | SILVA, Silvia Aparecida José e | - |
dc.contributor.author | SILVA, Diego Soares da | - |
dc.contributor.other | GARBERO, Reydner Furtado | - |
dc.contributor.other | CAETANO, Luiz Carlos | - |
dc.date.accessioned | 2023-12-29T12:02:33Z | - |
dc.date.available | 2023-12-29T12:02:33Z | - |
dc.date.issued | 2023-11-28 | - |
dc.identifier.citation | SILVA, Diego Soares da. Relatório técnico de projeto de melhoria na empresa Suzano Papel e Celulose S/A, 2023. Trabalho de conclusão de curso (Curso Superior de Tecnologia em Gestão Empresarial) - Faculdade de Tecnologia de Americana "Ministro Ralph Biasi", Americana, 2023. | pt_BR |
dc.identifier.uri | https://ric.cps.sp.gov.br/handle/123456789/15480 | - |
dc.description.abstract | O presente relatório foi elaborado com o intuito de reduzir o tempo de setup de máquina. Elaboraborado pelo curso de Gestão Empresarial, na Escola Superior de Tecnologia FATEC de Americana. Durante a experiência profissional na empresa SUZANO PAPEL E CELULOSE S/A, que dedica a sua atividade a produzir papel e celulose, foi identificada a necessidade de melhorar um dos indicadores de performance, nomeadamente os tempos médios de preparação. Foi identificado um GAP no processo operacional de setup de máquina e com isso foi elaborado um plano de ação, baseado na aplicação do sistema SMED. O objetivo é reduzir o tempo de setup de máquina, transformando setup interno em externo, a fim de evitar perdas de prazos e tempo improdutivo, o que alivia também o orçamento de custos. | pt_BR |
dc.description.abstract | This report was prepared with the aim of reducing machine setup time – Business Management, at the FATEC School of Technology. During professional experience at the company SUZANO PAPEL E CELULOSE S/A, which dedicates its activity to producing paper and cellulose, the need to improve one of the performance indicators (Setup) was identified, namely the average preparation times. Based on this analogy, a GAP was identified in the machine setup operational process, and an action plan was created, based on the application of the SMED system. The objective is to reduce machine setup time, transforming internal setup into external setup, in order to avoid missed deadlines and unproductive time, which also alleviates the cost budget. | pt_BR |
dc.description.sponsorship | Curso Superior de Tecnologia em Gestão Empresarial | pt_BR |
dc.language.iso | pt_BR | pt_BR |
dc.publisher | 004 | pt_BR |
dc.subject | Administração da produção | pt_BR |
dc.subject | Administração de empresas | pt_BR |
dc.subject.other | Gestão e Negócios | pt_BR |
dc.title | Relatório técnico de projeto de melhoria na empresa Suzano Papel e Celulose S/A | pt_BR |
dc.title.alternative | Technical report on an improvement project at the company Suzano Papel e Celulose S/A | pt_BR |
dc.type | Relatório Técnico | pt_BR |
Appears in Collections: | Trabalhos de Conclusão de Curso |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
20232S_Diego Soares da Silva_OD1800.pdf Restricted Access | 6.62 MB | Adobe PDF | View/Open Request a copy | |
TA - Diego Soares da Silva.pdf Restricted Access | 990.83 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.